• About Us
  • Solutions
  • Testimonials
  • PCI – HIPAA
  • Contact
  • MBI Companies
    • Sign Engineering
      testing testing
    • MBI Technologies
    • Construction Services
  • About Us
  • Solutions
  • Testimonials
  • PCI – HIPAA
  • Contact
  • MBI Companies
    • Sign Engineering
    • MBI Technologies
    • Construction Services

Heritage High School Science Wing Renovation

Heritage High School Science Wing Renovation As a result of a facility needs assessment, MBI was enlisted for full design services for the complete renovation of the Heritage High School’s science wing. The classrooms, science labs, collaboration and staff spaces […]

Chattanooga State Health Sciences

Project Information Chattanooga State Health Sciences This joint-venture project with another local architecture firm is a 105,000 square foot two-story facility designed to bring all the medical technology programs of the community college into one state-of-the-art facility. The building includes […]

Rhea County High School

Project Information Rhea County High School MBI provided design for a new 2,000 student 9-12 grade facility with renovated middle school. At the heart of the high school is a large common area for students to gather during school hours, […]

Fletcher Hall / Success Center Renovation Expansion

Project Information Fletcher Hall / Success Center Renovation Expansion MBI was selected to design the renovation of the main floor of Fletcher Hall to accommodate the College of Business Student Success Center. By providing a space where students could easily access student […]

Red Bank Middle School

Project Information Red Bank Middle School Red Bank Middle School was originally housed in an 80-year old facility designed for a high school. The Hamilton County Department of Education chose to replace the old building with a new 158,000 square foot middle school on […]

Cahaba Elementary School

Project Information Cahaba Elementary School MBI was selected to renovate and expand an old historic high school into a new elementary school. The original building was constructed in the 1930s with a gymnasium added in 1960 and classroom addition in 2001. MBI […]

© Copyright MBI Companies Inc. 2022

Close